Opens in a new tab

M8 Motorway

Service
Labour Hire Solutions, Infrastructure Installations
Location
St Peters
Contractor
UGL/CIMIC
Industry
Road
Year
2019
IMG 9433 (1)

Installation of all Signage, Cable Containment and CCTV Equipment

The WestConnex M8 is a 9-kilometre-long tolled motorway that links the M5 Motorway at Kingsgrove to a newly built interchange at St Peters meant to ease the congestion built up on the M5 East. It consists predominantly of tunnels and includes tunnel connections to the future M4–M5 Link (the second stage of M8) and M6 Motorway.

It is one of the longest road tunnels in Australia, along with the NorthConnex, and the second major WestConnex project with a $4.3 billion budget.

Ascent provided teams of mechanical installations skilled teams to build the new road tunnel from Kingsgrove to St Peters and undertook the installation of 5 km of signage, speakers, CCTV brackets, and cable containment down the side of the walls, traffic control signs equipment, and PA.

 

WestConnex M8 workers:

  • Supervisors
  • Tradesmen/women
  • General labourers
  • Leading hands
  • Skilled trades assistants
  • Boilermakers
  • Riggers
  • Fitters

Site facts & figures

0

Month long project

0

Cable containment brackets installed/tunnel signage

IMG 9369 (1)IMG 9355 (1)

Our challenges

Wins

Ascent’s high-quality standards, along with skilled personnel and resolving any issue quickly on this project have bolstered our good name and reputation.

Challenges

Access to certain areas was restricted, making it essential to do everything right the first time. Therefore, meticulous planning was crucial to ensure the correct materials and equipment were readily available when needed.

Site facts & figures

0

Km of signage and cable containment

0

Workers on site